LOCATION AND DESCRIPTION: 
The project is located approximately 25 miles south of Downtown Los Angeles in San Pedro Bay. Two of the world’s largest ports are located within this harbor - Port of Los Angeles and Port of Long Beach. Port of Los Angeles (POLA) is ranked the busiest container port in the US and number 17 in the world. Container volume in 2018 was 9.5 million twenty-foot equivalent units (TEUs), cargo valued at $273 billion. Port of Long Beach (POLB) is ranked the second busiest port in the US and number 20 in the world. Container volume in 2018 was 8.1 million TEUs, cargo valued at $180 billion. If combined, the ports of Los Angeles and Long Beach would be the world’s ninth busiest port complex by container volume.  The project also includes a federal channel in the mouth of Los Angeles River. This federal channel provides service to the City of Long Beach. The Catalina Express, a ferry operation to the Catalina Islands, operates in the vicinity of the federal channel.

AUTHORIZATION:  
WRDA 1976, 1986,1988 and 1996.

ACTIVITIES FOR FY 2023:  
See IIJA Activities. 

IIJA  ACTIVITIES:
Funds used to conduct an annual structure survey to track progression of failures.

FY 2024 PLANNED ACCOMPLISHMENTS:
Optimal funding could be used for maintenance dredging and to conduct annual structural survey. 

ISSUES AND OTHER INFORMATION: 
Since there is no sediment flow into the harbor, minimal dredging is required. Both ports are Donor and Energy Transfer Port fund recipients. Two studies  
are underway – POLB Navigation Improvements
(Successful Chief’s Report, Oct 21) and East 
San Pedro Bay Eco System Restoration.          

CONGRESSIONAL INTEREST:  
Representatives Barragan (CA-44), Lowenthal (CA-47), and Steel (CA-48)

FINANCIAL SUMMARY  As of 01Mar 23
                 O&M
Estimated Federal Cost    $12,375,0000
Estimated Non-Federal Cost    $0
Total Estimated Project Cost    $12,375,00001/
Allocation thru FY22    $10,961,2902/
President’s Budget FY23    $0
Conference Add for FY23    $0
Approved IIJA FY23    $0
Workplan for FY23    $12,375,000
President’s Budget for FY24    $2,455,2003/
Workplan for FY24    TBD
Balance to Complete After FY24    N/A

U.S. ARMY CORPS OF ENGINEERS –     LOS ANGELES DISTRICT
915 WILSHIRE BLVD., SUITE 1109, LOS ANGELES, CA 90017
http://www.spl.usace.army.mil


    

                 


Contact
Congressional Liaison
executiveoffice.spl@usace.army.mil