ImageGallery

Oceanside Harbor navigation dredging 2017
This close-up view of the sections of high-density polyethylene, or HDPE, pipe shows the flanges Manson will use to connect the 500-foot sections. Segments will be added to increase the length of the discharge pipe as the project places the material south along the beach.

Download Image: Full Size (0.8 MB)
Tags:
Photo by: Greg Fuderer |  VIRIN: 170411-A-OX300-004.JPG