ImageGallery

LA District marks completion of Newport Bay Harbor jetty repairs
Mark Golay, second from right, U.S. Army Corps of Engineers Los Angeles District Navigation Branch program manager, accompanies Chris Miller, right, public works manager with the City of Newport Beach; Robert Silva, left-foreground, construction inspection supervisor with the City of Newport Beach; and Jorge Tomas, director of operations and sales with Pacific Dredge, on a walkthrough of the Newport Bay Harbor east jetty Sept. 1, 2021, in Newport Beach, California.

Download Image: Full Size (1.83 MB)
Tags:
Photo by: Stephen Baack |  VIRIN: 210901-A-UT290-0002.JPG