News Story Archive

News Story Manager

Results:
Archive: April, 2021
Clear
  • April

    VIDEO Prado Basin Ecosystem Restoration, Chief's Report

    On April 22, Earth Day, Lt. Gen. Scott Spellmon, the 55th Chief of Engineers, signed a Chief’s Report, which recommends a multi-year, multi section plan to tackle loss and/or degradation of aquatic, riparian woodland and floodplain habitats along the Santa Ana River due to numerous issue the waterway has experienced since the 1940s.
  • Oceanside Harbor navigational dredging underway

    Oceanside Harbor navigational dredging is an annual project conducted by the U.S. Army Corps of Engineers Los Angeles District to maintain the federal channel within the harbor at its authorized depth and to provide safe navigation for the recreational, commercial and military vessels that use the channel.