SPL-2019-408-2019-0026 Cucamonga Channel Waterline on Remington Avenue Bridge

Published Sept. 26, 2019

The Chino Basin De-salter Authority is proposing to install a 12 inch diameter steel waterline inside an 18 inch diameter steel casing by attaching hangers to existing bridge parapet over Cucamonga Channel at Remington Avenue.  The purpose of the project is to facilitate construction of new raw waterline from Remington Avenue Bridge to the mainline in Archibald Avenue, and is located in the city of Ontario, San Bernardino County, California.