ImageGallery

POLA Deepening
A crane lifts the last bucketfull of material from the Port of Los Angeles main channel April 3, marking the end of the Corps' 10-year project. The dredging project removed 15 million cubic yards of material in total, deepening the channel to a depth of 53 feet that will allow passage of "post-Panamax" ships.

Download Image: Full Size (7.12 MB)
Photo by: David A. Salazar |  VIRIN: 130403-A-LA999-283.JPG