Review Plans

Aliso Creek

Arroyo Seco

Carpinteria Shoreline

CA Sediment Master Plan

Cave Buttes

East San Pedro Bay Ecosystem Restoration

Encinitas-Solana Beach Shoreline

Hansen Dam Recreation

LA River

Little Colorado River

Lower Santa Cruz

Maintenance Dredging Harbors

Malibu Creek

Mount Charleston

Murrieta Creek

Nogales Wash and Tributaries

Pismo Beach CAP 103 2013

Pismo Beach Cap 103 2015

Port Hueneme Deepening Project

Port of Long Beach Deep Draft Navigation 

Prado Dam Spillway Modifications 

Prado Basin Corona

Rio Salado (Salt River) Environmental Restoration Project - McClintock Drive to Town Lake Phase III

Rio Salado Oeste Environmental Restoration Phase

San Clemente Storm Damage and Shoreline Protection

San Diego County Shoreline

San Luis Rey River

San Pedro Bay Emergency Breakwater Repairs

San Pedro Bay Breakwater Repair Project

Santa Ana River Mainstem Prado Dam and Dikes

Santa Ana River Prado Dam Dikes and Sewage Treatment

Santa Ana River Mainstem Reach 9

Santa Ana River Mainstem Reach 9 - EDR, BNSF Railroad Bridge, and Phases 1, 2a, 2b, 3, 4, and 5a

Santa Ana River Mainstem Reach 9 - Phase 5b

Santa Cruz River (Tres Rios del Norte)

Santa Maria River Levee

Santa Ana River Basin

Sespe Creek

Seven Oaks

South Bay Harbor Water Recycling

Surfside Sunset Stage 13

Tres Rios Environmental Restoration

Tropicana Flamingo F-4 Channel Rehab

Tucson Drainage Area Flood Control Project

Tujunga Wash Ecosystem Restoration

Verdugo Wash Channel

Virgin River CAP 205

Westminster

Whittier Narrows Dam Safety Modification

Whittier Narrows Dam Spillway Modification Review Plan






 

Independent External Peer Reviews

Redirecting...

Review Plans Policy

It is the policy of USACE that all of its planning, engineering and scientific work will undergo an open, dynamic, and rigorous review process. Technical, scientific and engineering information that is relied upon to support recommendations in decision documents or form the basis of designs, specifications, and/or O&M requirements will be reviewed to ensure technical quality and practical application.

EC 1165-2-209 "CIVIL WORKS REVIEW POLICY" establishes an accountable, comprehensive, life-cycle review strategy for Civil Works products by providing a seamless process for review of all Civil Works projects from initial planning through design, construction, and Operation, Maintenance, Repair, Replacement and Rehabilitation (OMRR&R). It provides the procedures for ensuring the quality and credibility of U.S. Army Corps of Engineers (USACE) decision, implementation, and operations and maintenance documents and work products.

This policy addresses OMB peer review requirements under the "Information Quality Act" and the Final Information Quality Bulletin for Peer Review by the Office of Management and Budget (referred to as the "OMB Peer Review Bulletin”). It also provides guidance for the implementation of both Sections 2034 and 2035 of the Water Resources Development Act (WRDA) of 2007 (Public Law (P.L.) 110-114).

Contact Us

For additional information contact:

Chief, Plan Formulation Branch, 213-452-3820

Chief, Design Branch, 213-452-3707