ImageGallery

Corps replenishment of Redondo Beach
Jeff Cole, US Army Corps of Engineers manager for the Marina del Rey, Calif., entrance channel navigation dredging project, speaks with a reporter at Redondo Beach, Calif., about the project's placement of nearly 75,000 cubic yards of sand there. The Redondo phase of the project is part of a Corps navigational dredging project to remove about one million cubic yards of sediment at Marina del Rey to restore navigational safety for mariners and first responders.

Download Image: Full Size (2.28 MB)
Tags:
Photo by: Greg Fuderer |  VIRIN: 120821-A-OX300-001.JPG