Fact Sheet

Investigations - Los Angeles County DMMP

U.S. Army Corps of Engineers, Los Angeles District
Published April 15, 2023

LOCATION AND DESCRIPTION:
The Dredge Material Management Framework (DMMF) includes the LA River Estuary (Long Beach - LB), Port of LB, Port of LA, and Marina del Rey, located within the coastal waters of LA Co. All four areas need removal and disposal of contaminated dredged sediments. The Ports of LA; LB; City of LB and LA Co (Marina del Rey) could generate a total of 2.5M cubic yards of contaminated dredged sediment over the next five years. The project creates regional strategy with regulatory coordination for removing the majority of sediments, managing the disposal of contaminated sediments from multiple projects and identifying a multi-user disposal site for receipt of these sediments. Failure to dredge contaminated material may result in economic hardship for the ports, the marina and the City of LB. This study ends upon the completion of the Dredge Material Management Framework document.

AUTHORIZATION: WRDA 92, Sec 204 (as amend by WRDA 96, Sec 207)

ACTIVITES IN FY 2023: Final Report completed and close-out study underway.

FY 2024 PLANNED ACCOMPLISHMENTS: None

ISSUES AND OTHER INFORMATION: Contaminated sediments in Marina del Rey, the Los Angeles River Estuary, and the Ports of Los Angeles and Long Beach must be removed to ensure navigational safety and to provide for port expansion. Permanent disposal sites are not available, and the continued buildup of contaminated sediments raises concerns of potential impact on public health as well as the health of the marine environment. Safe navigation within small craft harbors can be jeopardized by shoaling that cannot be removed and disposed of safely or economically, making the nation's largest and most productive port complex unable to meet increasing demands. The cost increase is due to the regional nature of the study, the intense coordination with the sponsors, and contaminated sediments task force. Additional studies were performed that were not originally foreseen. Although the study name will not be changed, this study is now considered a "Framework" or DMMF rather than a "Plan" or DMMP.

SUMMARIZED FINANCIAL DATA:
As of: 1 Mar 23
Feasibility

Estimated Federal Cost             $2,193,000
Estimated Non-Federal Cost          $2,193,000
Total Estimated Project Cost          $4,386,000
Allocation thru FY22               $2,193,000

President’s Budget for FY23               $0
Conference Add for FY23                $0
Approved IIJA FY23                   $0
Workplan for FY23                    $0
President’s Budget for FY24              TBD
Approved IIJA FY24                  TBD
Workplan for FY24                   TBD
Balance to Complete After FY24 $0
 


CONGRESSIONAL INTEREST: Senators Butler and Padilla; Representatives: Chu (CA-28), Aguilar (CA-33), Waters (CA-43), Porter (CA-47), and Issa (CA-48)

 

U.S. ARMY CORPS OF ENGINEERS – LOS ANGELES DISTRICT
915 WILSHIRE BLVD., SUITE 1109, LOS ANGELES, CA 90017
http://www.spl.usace.army.mil


Contact
Congressional Liaison
executiveoffice.spl@usace.army.mil