ImageGallery

121005-A-OX300-001
Dutra Dredging Company puts the final touches on the placement of nearly 75,000 cubic yards of sand at Redondo Beach as part of the Marina del Rey entrance channel navigation project shortly before the dredge Paula Lee departed and bulldozers contoured the sand to meet the required beach profiles, leaving residents and visitors with a wider, more protective beach.

Download Image: Full Size (0.13 MB)
Tags:
Photo by: Greg Fuderer |  VIRIN: 121005-A-OX300-001.JPG