ImageGallery

March ARB breaks ground on new airfield traffic control tower and base operations facility
The new $16.5 million project is designed to meet the Leadership in Energy and Environmental Design Silver standard and replaces the current tower and airfield operations facility built in 1958. LEED is how the U.S. Green Building Council rates a project for its design and achievement in categories like sustainability, water efficiency, energy conservation and design innovation.

Download Image: Full Size (8.53 MB)
Tags:
Photo by: Dave Palmer |  VIRIN: 121208-A-IE537-006.JPG