ImageGallery

Connolly-Pacific crane places rocks on middle breakwater
A Connolly Pacific crane operator moves a 9-ton rock into position along the Port of Long Beach Middle Breakwater. Repair work on the breakwater is being accomplished under a Corps of Engineers contract to repair damage suffered in late August during heavy seas from Hurricane Marie.

Download Image: Full Size (3.19 MB)
Tags:
Photo by: Greg Fuderer |  VIRIN: 141029-A-OX300-048.JPG