ImageGallery

Pilings along Reach 9 of the Santa Ana River
Corps employees and contractors discuss the status of piling installation along a section of Reach 9 of the Santa Ana River just downstream from Prado Dam. The pilings are part of bank protection along the flood risk reduction project.

Download Image: Full Size (1.03 MB)
Tags:
Photo by: Greg Fuderer |  VIRIN: 121010-A-OX300-003.JPG