ImageGallery

Corps discusses options for proposed Lone Star project
Mike Langley, a senior project manager in the District's Regulatory Division, discusses two project alternatives described in the draft EIS that would require authorization under Section 404 of the Clean Water Act for the discharge of dredged or fill materials within waters of the U.S. The project is located within the boundary of the existing Safford Mine Facility, approximately 8 miles north of Safford.

Download Image: Full Size (1.08 MB)
Tags:
Photo by: Dave Palmer |  VIRIN: 160628-A-IE537-017.JPG