ImageGallery

Channel Islands Harbor maintenance dredging
A Seattle-based Manson Construction employee controls the hydraulic cutter-head suction dredge H.R. Morris as it digs up sediment from the Channel Islands Harbor sand trap Feb. 14. Manson, the Corps' contractor for the project, piped the material to nearby Hueneme Beach to replenish sand lost to erosion.

Download Image: Full Size (0.45 MB)
Photo by: Jay Field |  VIRIN: 170214-A-LY070-006.JPG