LOCATION AND DESCRIPTION:
Matilija Dam is located on Matilija Creek, a tributary to the Ventura River, near Ojai, in Ventura County. The dam is no longer functional as a water supply structure. It is a major impediment to the natural flow of the Matilija Creek, which traditionally supported a large population of Steelhead, a migratory fish related to the Salmon, and an endangered species. The study addressed the following issues: hydrology, hydraulics, dam safety, removal issues, water allocation, flood control, flood plain management, sediment removal, transport, beach nourishment, and environmental restoration. Authorized project features: Foster Park Wells; Live Oak Levee Meiners Oaks Levee; Sediment Highflow Bypass, Camino Cielo Bridge; Santa Ana Road Bridge; Desilting Basin; Arundo Removal and Matilija Dam Removal (Slurry Line, Earth Moving, Recreation Trail, Dam Removal).

AUTHORIZATION:
Resolution of Senate Public Works Committee adopted September 25, 1969. Resolution of House Transportation and Infrastructure Committee, Docket #2593, adopted 15 April 1999. WRDA 2007 Section 1001(10)

ACTIVITIES FOR FY 2023:
None.

FY 2024 PLANNED ACCOMPLISHMENTS:
Optimal funds could be used to initiate GRR efforts.

ISSUES AND OTHER INFORMATION:
A multi-stakeholder team has been working to address current issues related to the handling of fine material
and dam removal options. A Technical Advisory
Committee will assist the stakeholders in refining
sediment handling concepts. The USACE design efforts are on hold.

CONGRESSIONAL INTEREST:  Representatives Carbajal (CA-24), Brownley (CA-26)

FINANCIAL SUMMARY

 

As of 01 Mar 23

Construction

Estimated Federal Cost

$89,700,000

Estimated Non-Federal Cost

$54,800,000

Total Estimated Project Cost

$144,500,000

Allocation thru FY22

$4,203,000 1/

President’s Budget for FY23

$0

Conference Add for FY23                                     

$0

Approved IIJA FY23

$0

Workplan for FY23

$0

President’s Budget for FY24

$0

Workplan for FY24

TBD

Balance to Complete After FY24

$85,497,000

1/ PED funds received

 



 

Contact