LOCATION AND DESCRIPTION:
The study area is located in the City of Buckeye, AZ, within Maricopa County, which includes the stretch of the Gila River from Perryville Road to Phoenix Bypass Route 85. Key infrastructure and residences are at risk of inundation associated with flows from the north bank of the Gila River. The purpose of this project is to reduce flood risk originating from the Gila River within the City of Buckeye and unincorporated Maricopa County. A Federal Interest Determination (FID) study was performed and based on an economic analysis there appeared to be preliminary federal interest in a project to reduce the risk of flood damage to the City of Buckeye’s Wastewater Treatment Plant (WWTP). The Feasibility Study is in progress focused on flood risk reduction at the WWTP.
AUTHORIZATION: WRDA 07, Section 1002(a)(7) - Public Law 110-114; CAP Section 205; project limit is $10M Fed.
ACTIVITIES FOR FY 2023: Funds will be used to coordinate with the City of Buckeye.
FY 2024 PLANNED ACCOMPLISHMENTS: Pending a decision to continue the study and with optimal funding complete the final Feasibility Report.
ISSUES AND OTHER INFORMATION: Based on a recent economic forecast, a project may not be recommended since the benefit to cost ratio is about unity. Sponsor is evaluating whether to continue with this study.
FINANCIAL SUMMARY: As of 12 Apr 23 Feasibility
Estimated Federal Cost $496,000
Estimated Non-Federal Cost $496,000
Total Estimated Project Cost $992,000
Allocation thru FY22 $725,000
President’s Budget for FY23 $0
Conference Add for FY23 $0
Approved IIJA FY23 $0
Workplan for FY23 $0
President’s Budget for FY24 $0
Approved IIJA FY24 $0
Workplan for FY24 $TBD
Balance to Complete After FY24 $TBD
CONGRESSIONAL INTEREST: Senators Sinema and Kelly, Representatives Stanton (AZ-04), Gosar (AZ-09)