Construction - Western Rural Water, AZ Pascua Yaqui

U.S. Army Corps of Engineers, Los Angeles District
Published April 17, 2023

SECTION 595 AUTHORITY & PURPOSE:
Water Resources Development Act (WRDA) 1999 Section 595 authorized the U.S. Army Corps of Engineers (USACE) to provide design and construction assistance for water supply, wastewater treatment, environmental restoration, and surface water protection to rural communities. Section 4008 of the Water Resources Reform and Development Act of 2014 amended WRDA 1999 Section 595, authorizing $490M for technical assistance to small and rural communities in Idaho, Montana, Nevada, New Mexico, Utah, and Wyoming. WRDA 2020 added a $150M authorization for Arizona projects with WRDA 2022 increasing the authorization by $50M ($200M total). Projects are to be cost shared 75% Federal and 25% non-Federal. The Federal share may be in the form of reimbursements.

ACTIVITIES FOR FY 2023: Carryover funds will be used to complete design, environmental compliance and begin construction on the water distribution pipeline. Incoming Reimbursements Packages will be reviewed for completeness and processed accordingly.

FY 2024 PLANNED ACCOMPLISHMENTS: Once environmental compliance is complete construction will begin.

ISSUES AND OTHER INFORMATION: Approximately 10 miles southwest of the City of Tucson, AZ. Project will focus on design and construction of a water distribution pipeline delivering non-potable water in lieu of potable water from the City of Tucson for irrigation at the Tribes Wellness Center and associated ball fields on the Pascua Yaqui Reservation.
AUTHORIZATION: WRDA 1999 (P.L. 106-53), Sec. 595; WRDA 2007 (P.L. 110-114), Sec. 5067; Energy and Water Development Appropriations Act (EWDAA) 2004 (P.L. 108-137), Sec. 117; EWDAA 2010 (P.L. 111-85), Sec. 112(2); Water Infrastructure Improvements for the Nation Act 2016 (P.L. 114-322), Sec. 1186; WRDA 2020 (P.L. 116-260), Div. AA, Sec. 352

As of: 01 Mar 23
FINANCIAL SUMMARY:         CONSTRUCTION
Estimated Federal Cost              $1,478,000
Estimated Non-Federal Cost                  $492,667
Total Estimated Project Cost               $1,970,667
Allocation thru FY22               $1,478,000

President’s Budget for FY 23                               $0
Conference Add for FY23                               $0
Approved IIJA FY 23                               $0
Workplan for FY 23                               $0
President’s Budget for FY24                               $0
Workplan for FY24                            TBD
Balance to Complete After FY24                               $0
 

CONGRESSIONAL INTEREST: Senators Kelly and Sinema, Representatives Stanton (AZ-04), Grijalva (AZ-07)

 

U.S. ARMY CORPS OF ENGINEERS – LOS ANGELES DISTRICT
915 WILSHIRE BLVD., SUITE 1109, LOS ANGELES, CA 90017
http://www.spl.usace.army.mil


Contact
Congressional Liaison
executiveoffice.spl@usace.army.mil