ImageGallery

141029-A-OX300-036
A spotter for Connolly Pacific helps the crane operator place a 10-ton rock along the Port of Long Beach Middle Breakwater. The work is being accomplished under a Corps of Engineers contract to repair damage the breakwater suffered in late August during heavy seas from Hurricane Marie.

Download Image: Full Size (3.53 MB)
Tags:
Photo by: Greg Fuderer |  VIRIN: 141029-A-OX300-036.JPG