ImageGallery

Oceanside Harbor navigation dredging project 2017
This is the initial segment of pipeline that connects the dredge HR Morris to additional lengths along the beach. Dredge operators adjust the intake to create a slurry that is about 15-20 percent material and 85-80 percent water for maximum efficiency.

Download Image: Full Size (0.82 MB)
Tags:
Photo by: Greg Fuderer |  VIRIN: 170418-A-OX300-008.JPG