ImageGallery

Oceanside Harbor navigation dredging project 2017
Manson Construction Company buried the nearly 2,500 feet of the 30-inch diameter discharge pipeline from the entrance channel at the north end of Oceanside's beach to the mouth of the San Luis Rey River. Burying the pipe improves safety for visitors, provides a more natural beach setting and reduces the time and cost to complete the project.

Download Image: Full Size (1.04 MB)
Tags:
Photo by: Greg Fuderer |  VIRIN: 170413-A-OX300-003.JPG