News Release Manager

Results:
Tag: San Bernardino County Flood Control District
Clear
  • Corps reclassifies Prado Dam, implements risk-reduction measures

    The U.S. Army Corps of Engineers has changed Prado Dam’s risk characterization from moderate urgency to high urgency, based on a recent assessment. In May 2019, a site specific evaluation was conducted to assess conditions associated with the dam as part of a periodic review of its performance. Risk factors identified indicate the potential for poor spillway performance, which could have adverse impacts to the downstream population, if a significant flood event occurs.