News Release Manager

Results:
Tag: Santa Ana River Mainstem Project
Clear
  • Corps, tri-counties amend partnership agreement for the Santa Ana River Mainstem project

    Col. Julie Balten, commander of the U.S. Army Corps of Engineers Los Angeles District, signed an amendment to the Local Cooperation Agreement between the Department of the Army and three county flood control districts for the Corps’ Santa Ana River Mainstem project during a Jan. 28 virtual ceremony. Partners from the project’s tri-county areas of Riverside, San Bernardino and Orange participated in the ceremony. The $2.83 billion Santa Ana River Mainstem project is designed to reduce flood risk for more than 1 million people along the Santa Ana River’s 96-mile journey, from Seven Oaks Dam near San Bernardino to Huntington Beach, where it flows into the Pacific Ocean.
  • Corps, Orange County amend partnership agreement for Santa Ana River Mainstem project features to enhance flood protection

    The U.S. Army Corps of Engineers Los Angeles District and the Orange County Flood Control District are pleased to announce the signing of an amendment to use Bipartisan Budget Act of 2018 funds for select features of the Santa Ana River Mainstem project, designed to improve flood protection for more than 1 million people.
  • Corps reclassifies Prado Dam, implements risk-reduction measures

    The U.S. Army Corps of Engineers has changed Prado Dam’s risk characterization from moderate urgency to high urgency, based on a recent assessment. In May 2019, a site specific evaluation was conducted to assess conditions associated with the dam as part of a periodic review of its performance. Risk factors identified indicate the potential for poor spillway performance, which could have adverse impacts to the downstream population, if a significant flood event occurs.